Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634574

- Product Categories
- Friendly Links
Information Name: | APC-3 gear heater |
Published: | 2015-01-07 |
Validity: | 300 |
Specifications: | APC-3 gear heater |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | Jingjiang bearing heater factory direct bearing installation tool by the end of the promotion, custom large bearing heater, bearing heater lowest end of the year Contact: Zhang Li Mobile: 13952629874 Tel: 0523-84955058 Fax: 0523-84633358 QQ: 288 039 0815 Product Name: Detail APC-3 gear gear heater heater Jingjiang Connaught safety equipment specializing in the production of platinum gear heater APC series, models APC-1 / APC-2 / APC-3 / APC- 4 / APC-5 / APC-6 / APC-7 / APC-8. Heating gears special thick-walled workpieces, imported cold-rolled silicon steel, copper coil production, the most high-quality bearing wall heater gears thicker workpieces dedicated ◆ power adjustment, automatic degaussing ◆ ◆ soot pollution-free environment and money , time-saving, energy-saving, fuel-efficient, improve the quality of assembly ◆ simple and reliable, uniform heating, no fire hazard APC Series Gear special induction heater operating instructions: Installation: 1, respectively, and host control box attached to the right place. Host right direction should be horizontal, vertical front tilted backwards to allow no more than 3 degrees. 2. After installation is complete, before using electrical schematics must be reviewed, the wiring is correct. 3, correct, close the switch, the power, the voltmeter should indicate at this time. 4, heating the workpiece to be placed below the middle of the host iron core activities yoke gently move down, and make the piece fit (if workpiece thickness dimensions remain unchanged, the lever can be adjusted after the host of the screw below the bridge, so that the yoke 2mm spacing and holding the workpiece, to facilitate continuous operation). So far, commissioning end can be put to use. Operating procedures: 1. Press the start button, the host is powered relay starts counting the time, in seconds, the workpiece is heated. 2. Press the stop button before, saw time count, then remove the artifacts, to measure the inner diameter of the end plane of the temperature meets the requirements to suit. 3, the continuous heating of the same size of the workpiece, the function selector switch to the time control position, set the heating time, when the workpiece is heated to the set time automatically shut off the power. 4, after the work is completed, the power switch to the stop position, turn off the power. Note: APC good chassis ground must not be placed in front of the workpiece, press the start button is prohibited!. This series of products to control the power or wiring is AC220V AC380V, socket and plug the response should be the same. Do not exceed the bearing heating temperature 120 ℃, to prevent annealing; other artifacts maximum heating temperature of not more than 300 ℃ |
Admin>>>
You are the 15803 visitor
Copyright © GuangDong ICP No. 10089450, Jingjiang City in Connaught instrumentation LLC All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15803 visitor
Copyright © GuangDong ICP No. 10089450, Jingjiang City in Connaught instrumentation LLC All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility